SAVE THE DATE - Final conference in Cambodia, Phnom Penh August 17-18, 2022

First Internal Evaluation Report (November 2019)

This report is part of work package 4: activity 4.1 and contributes to the output activity labeled Periodic Internal Evaluations on the LFM. This report provides an overview of the results of the first internal evaluation developed in August/September 2019 and conducted in October/November 2019. It was based on an online questionnaire with six indicator groups and 40 items.

Download the report

Third Internal Evaluation Report

As part of W2–Quality Assurance, internal evaluations have to be conducted twice a year. The aim of the internal evaluation is to evaluate the project’s progress and co-operation between project partners regularly. Moreover, the evaluation aims at reviewing and improving communication and project results including the website, organization of meetings and issues related to COVID-19.
Against this background, this report provides an overview of the results of the Fourth and Fifth Internal Evaluation conducted in March and September/October 2021.

Download the report

Testing the Train-the-Trainer Program Report

This report is part of work package 4: activity 4.2 and contributes to the output activity labeled Testing the Train-the-Trainer Program. This report provides an overview of the results of the internal testing at
Dresden University of Technology (TUD) conducted in June 2021 and the evaluation (survey) run directly after the implementation of the TTT-workshops in July/August 2021

Download the report